1, the stone blanking position should be accurate. The stone must be in the middle of the cone crusher distribution plate and cannot be directly thrust into the crushing chamber. Direct punching is easy to cause crusher overload, liner wear uneven. The correct ore feeding method is: the stone is evenly dispersed in the crushing chamber by the distribution plate. And the ore entering can not be higher than the level of the mill wall.
2, the stone to be broken should be less than 85% of the size of the equipment to the mine. If the size is greater than this, the production will be reduced, the crusher is overloaded, and some components will be damaged.
3, the cone can not be started with load, load starting will cause accidents.
4, stop the order to be correct. The feeder must be stopped first, and the ore that has entered the crushing chamber must be crushed and discharged, and then the crusher must be stopped.
5, daily inspection should be in place in time. When the cone crusher is in production, the pressure of the locking system and the work of the hydraulic station should be checked frequently, and the problems should be dealt with in time.
Post time: Dec-10-2024